Background
The Harbin Dispatch Office is located on the northwest side of the China Railway Harbin Group in Nangang District, Harbin, and is the last dispatch office project in China. The communication major on the first floor of the main building is mainly the data modulation system, new video server, etc.. The information major on the second floor is mainly the ticket system, travel service system, etc.. The signal major on the third floor is mainly TDCS system and CTC system. The fourth floor of the main building is mainly for the installation of equipment in the dispatching hall.
Application Scenarios
Solution
Features
- Provide 1 local user channel and 4 extended local user channels (additional local workstations are required)
- Single IP allows 4 IP users to remotely access and control through the network
- Dual power supplies and dual 10/100/1000m adaptive network interfaces
- The video resolution of the local station is up to 2048 X 1536 @ 60Hz
- The video resolution of the remote station is up to 1920 X 1080 @ 60Hz
- Automatically adjust the resolutions of videos when switching servers
Result
Kinan HT5432 KVM over IP switch helped Harbin Dispatch Office achieve high-efficiency dispatching, and provide more connenient trasportation service for people. In addition to these advantages, the data can be stored safely in the data center.